What is the difference between demurrage and detention?

Demurrage is charged for cargo sitting inside the terminal beyond the agreed free time. Detention is charged for keeping the carrier's equipment outside the terminal beyond its free time. The two run on separate clocks, are often billed by different parties, and can both appear on one delayed container.

Written by Raja Torain. Published 2026-08-18, last reviewed 2026-08-24.

The two are billed by different clocks and often by different parties, which is why a single delayed container can generate two invoices that look duplicated but are not.

Disputes usually turn on evidence: appointment availability, terminal gate records, chassis supply and the exact free-time terms in the contract. Collect that evidence while it is fresh, not after the invoice arrives.

What I Check First

  1. 1.What free time was actually contracted, per container type?
  2. 2.Was the terminal accepting returns on the days being billed?
  3. 3.Do gate-in and gate-out timestamps support the charge?

In practice

The expensive version is usually documentary, not operational: the cargo is available and the release is not. Free-time terms and release type belong in writing before departure, not in the first invoice dispute.

One decision like this in your inbox, every other week. No pitch.

One shipping or trade decision, worked through the way it happens in operations — what to check, what it costs to get wrong, what to do next. Roughly twice a month. Nothing else is sent to this address.

By submitting you're subscribing to the Logistics Decision Brief only. Your address is stored privately, never sold or shared, and you can stop it any time by replying. See the privacy notice.

Cargo stuck, quoted wrong, or about to be? Send me the cargo, the location and the deadline

Raja Torain

About the author

Raja Torain

International logistics and trade operations practitioner. Writes about freight forwarding and NVOCC operations, complex and project cargo, tariff and landed-cost exposure, and the records behind duty drawback programmes. More about Raja.

Have cargo to move?

Tell me the commodity, the lane, the packed dimensions and the date it has to be there. I read every message myself.

Or keep reading: freight answers, operating checklists or the Logistics Decision Brief.