Project & OOG Pre-Move Checklist

The pre-move discipline behind out-of-gauge, flat-rack, breakbulk and project cargo: verified dimensions and weight, centre of gravity, lifting and lashing, equipment and terminal capability, route survey, permits, vessel mode, insurance and final-mile constraints.

Who it is for: Project managers, plant and equipment engineers, exporters of machinery, and logistics leads planning a heavy-lift, oversized or breakbulk move.

Last reviewed 2026-08-26.

Sections in the checklist

  1. 1.Verified cargo data and drawings
  2. 2.Centre of gravity and lifting points
  3. 3.Lashing, securing and packing
  4. 4.Equipment and mode selection
  5. 5.Port and terminal capability
  6. 6.Route survey and permits
  7. 7.Lift planning and crane resource
  8. 8.Survey, insurance and documentation
  9. 9.Timing, weather and final-mile constraints

Get the printable checklist

The full Project & OOG Pre-Move Checklist opens immediately on this page — printable and saveable as a PDF from your browser. Raja asks for your details so she knows which operating problems people are actually working on, and so she can reply if you write back.

Trade-compliance content on this site is educational and is not customs, legal or tax advice. Raja Torain is not a licensed customs broker and does not file customs or drawback claims.

Other checklists

Have cargo to move?

Tell me the commodity, the lane, the packed dimensions and the date it has to be there. I read every message myself.

Or keep reading: freight answers, operating checklists or the Logistics Decision Brief.

Raja Torain

About the author

Raja Torain

International logistics and trade operations practitioner. Writes about freight forwarding and NVOCC operations, complex and project cargo, tariff and landed-cost exposure, and the records behind duty drawback programmes. More about Raja.