Landed Cost Risk Checklist
The line items that turn a clean quote into an ugly invoice: origin and destination charges, CFS handling, demurrage and detention, equipment, inland, duty assumptions, customs timing, exceptions and delivery constraints. Built for people who have to defend a landed-cost number.
Who it is for: Buyers, sourcing and category managers, controllers and operations leads who approve freight quotes and then have to explain the variance.
Last reviewed 2026-08-26.
Sections in the checklist
- 1.Scope of the quote and what sits outside it
- 2.Origin charges and export-side exposure
- 3.Ocean or air line-haul assumptions
- 4.Destination, CFS and terminal charges
- 5.Demurrage, detention and per-diem clocks
- 6.Equipment and inland movement
- 7.Duty, tariff and valuation assumptions
- 8.Customs timing and exception scenarios
- 9.Final-mile and delivery constraints
Trade-compliance content on this site is educational and is not customs, legal or tax advice. Raja Torain is not a licensed customs broker and does not file customs or drawback claims.
Other checklists
Have cargo to move?
Tell me the commodity, the lane, the packed dimensions and the date it has to be there. I read every message myself.
Or keep reading: freight answers, operating checklists or the Logistics Decision Brief.

About the author
Raja Torain
International logistics and trade operations practitioner. Writes about freight forwarding and NVOCC operations, complex and project cargo, tariff and landed-cost exposure, and the records behind duty drawback programmes. More about Raja.